Tuesday, June 30, 2009
Monday, June 22, 2009
Videos
Thanks to Hemi for directing, starring in, and editing these videos.
An overview of the vehicle:
And the "making of":
An overview of the vehicle:
RISD Human Powered Vehicle 2009 from Mike Eng on Vimeo.
And the "making of":
RISD Human Powered Vehicle 2009 - The Making of from Mike Eng on Vimeo.
Tuesday, June 9, 2009
FOR MORE PICTURES...
THE FINAL COAT
Saturday, May 23, 2009
ASSEMBLING THE DRIVE TRAIN
Assembling the drivetrain inside of the frame was definitely one of the most tense moments - taking all of our custom machined components and putting them to the ultimate test. We tested the fit of the components together and made sure nothing was rubbing on the inside of the frame. Though the assembly operation required a Leatherman, allen wrenches, and several improvised hooks, we were able to put everything together fine. The fit of the parts erred on the side of too tight. Only a couple of points inside the frame had to be sanded away to allow the chain to clear.




Saturday, May 16, 2009
FIRST ROUGH ASSEMLBY
THE SEAT
SANDING, LAYING, SANDING, LAYING....
Friday, May 15, 2009
Components, components, components
Sunday, May 10, 2009
DRYING PROCESS
LAYING CARBON FIBRE
SETTING UP THE JIG
PINK FOAM MODELL
Monday, May 4, 2009
NEW DESIGN
After locating the new position of the transfer hub, we had to come up with a new design. Biggest change is the drastic shortening of the rear fork and enlongment of the actual body. Further on, based on the new location of the transfer hub we had to relocate the saddle and integrated him into the body.

Subscribe to:
Posts (Atom)