skip to main
|
skip to sidebar
RISD HUMAN POWERED VEHICLE ´09
commuting without oil
Saturday, May 16, 2009
SANDING, LAYING, SANDING, LAYING....
To get enough stiffness and stability in the frame we have to lay layer over layer and do in between lots and lots of sanding.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
THE UPCOMING WEEK
tu, 12th may:
thu, 14th may:
last class
fri, 15th may:
bike to work day
FINANCIAL OVERVIEW
.....
.....
.....
contigency: 15%
---------------------
total: xx,xx $
---------------------
budget: xx,xx $
---------------------
available:
xx,xx $
CALENDER
__week 1:
tu, 17th feb: stduio lottery
thu, 19th feb: 1 meeting
__week 2:
tu, 24th feb: bike anatomy, visit lane myer
thu, 26th feb: structure lecture, visit providence bike
__week 3:
tu, 3th mar: mill & brazing, fibre demo, research drawing presentation
thu, 5th mar: presentation of concepts, establishing first fix criteria for the bike
__week 4:
tu, 10th mar: buil
ding seating prototype, getting measurements for seating position
thu, 12th mar:
concept sketches based on the new defined fix points
__week 5:
tu, 17th mar: concept model presentation at 1pm
thu, 19th mar: finalize materials order
________spring break__________
__week 6:
tu, 31th apr: build ridable prototype, work on the identity of the bike
thu, 2th apr: presenting the work of the two teams, changing wheel size
__week 7:
tu, 7th apr:working on concepts for specific
thu, 9th apr: overall design decision
__week 8:
tu, 14th apr: solidating concepts with numbers, ordering parts
thu, 16th apr:solidating concepts with numbers, ordering parts
__week 9:
tu, 21th apr: in progress presentation
thu, 23th apr:
__week 10:
tu, 28th apr:
thu, 30th apr:
__week 11:
tu, 5th may:
thu, 7th may:
__week 12:
tu, 12th may:
thu, 14th may: last class
fri, 15th may: bike to work day
__week 13:
tu, 19th may: final review, cheers
Blog Archive
▼
2009
(45)
►
June
(7)
▼
May
(14)
ASSEMBLING THE DRIVE TRAIN
FIRST ROUGH ASSEMLBY
THE FRONT FORK
THE SEAT
SANDING, LAYING, SANDING, LAYING....
Components, components, components
DRYING PROCESS
LAYING CARBON FIBRE
SETTING UP THE JIG
PINK FOAM MODELL
SOME IMPRESSIONS OF THE HARD WORKING STUDENTS
NEW DESIGN
COLLIDING DRIVE CHAIN
Drive Train Assembled
►
April
(10)
►
March
(14)
No comments:
Post a Comment